Decision intelligence for multi-phase AI and data-center campuses — connecting site potential with the evidence required to make it bankable.
SITES UNDER ASSESSMENT05
TOP PRELIMINARY SCORE74.7
WEIGHTED CRITERIA10
NON-NEGOTIABLE GATES07
Mexico AI Campus Site Intelligence
Five preliminary location-level screens. Select a point to inspect score, strategic thesis and diligence priorities.
MEXICO · PRELIMINARY SITE PORTFOLIO5 LOCATIONS
Selected site Candidate site
Site-Selection Scorecard
Each criterion receives a 0–5 rating. Weighted points = rating × weight ÷ 5.
Evidence Readiness
A strong score is not enough. Material assumptions should be supported by verifiable documentation.
Score ≠ Bankability
Strata separates site attractiveness from evidence readiness so decision-makers can see both opportunity and diligence gaps.
Automotive AI User Map
Multi-OEM suppliers and potential users of the proposed Domo Edge AI platform.
Identify and prioritize anchor users and design partners.
Focus on multi-OEM companies with intensive automation, data, computer vision, JIT/JIS logistics and processes that can scale across plants.
10target accounts5first-wave design partners
Industrial AI EdgeGPU Compute / AI FactoryAutomotive Data SpaceDigital Twin & SimulationConnectivity HubTec · Totale Strata AI Lab
Automotive AI Ecosystem
Verified operating locations and documented regional presence are separated from the proposed AI Campus/Domo concept. The connecting corridor expresses ecosystem relationships only — not fiber, power, ownership or service coverage.
LAYERS
Target Account Intelligence
Select an account to inspect its AI opportunity profile and recommended route to engagement.
The mix spans sequenced assembly, logistics, metal-forming/quality vision, JIS modules and multi-technology manufacturing, enabling multiple workloads without depending on a single business case.
Source profile: Automotive AI User Map · Arturo Cordova · Puebla, Mexico · 5 October 2026
Screen and compare land for a multi-phase AI/data-center campus integrating dedicated power, substations, BESS and, where technically viable, EXA Energy.
Deliverable power, diverse fiber, resilience and permitting remain gating requirements.
PRELIMINARY SCREENING ONLY · ATTACH RELEVANT DOCUMENTATION THAT SUPPORTS THE PROFILE OF THE SITE